The new $200,000 skatepark upgrades at Darlington Point Skate Park opened to the public to skate in early 2022. The original concrete park remains practically untouched, whilst a newly upgraded park was constructed and added to the total surface area of the skatepark.
The new section of the skatepark consists of a super mellow open bowl and a mini ramp. The original skatepark left untouched contains several transitions, a spine, a mini ramp and a few street features.
A well-constructed and designed skatepark with a seamless flow between the new and the old sections.
Ulladulla Skate Park
The Ulladulla Skate Park can be found in the Ulladulla Sports Complex next to the netball courts. The large concrete skatepark features big open bowls, a couple of spines, a signature vert wall and a bunch of street features. The skatepark was originally designed and...
Werri Beach Skatepark
Commonly referred to as Gerringong Skatepark, located on the foreshore next to Gerringong Beach, is the old Weerri Beach Skatepark. The old-school skatepark is on the smaller side, with a rough concrete surface and several skate features. The park has a mini ramp that...
Leumeah Pump Track
The New Leumeah Pump Track cost $490,000 to design and construct. The pump track was opened in early 2021 and has been a popular facility for skaters, scooters and, more often, bikes. The pump track is made out of tar and is very smooth. The layout of the track offers...