The initial park was a poor attempt of a skatepark. Narromine Skatepark sits on a medium sized concrete slab with a few features above. The skatepark has since been blessed with and entirely new adjacent skatepark. They have the space, so why would they replace a park when they can just build another one.
The original skatepark remains the same and they have built another skatepark just meters away with a mini ramp with a spine, along with a few other street obstacles. Not much logic in the design, but the skatepark is significantly better than what was once there.
Curran’s Hill Skatepark
A small skatepark with transitions and a ledge. The park has some modern humps in the middle to help us pump from end to end. There are quarters at each end, one of which is curved. There is a cool banking quarter in the middle and a ledge on the other side. They have...
The Ridge Pump Track
There is a new pump track in Barden Ridge. The Ridge Pump Track costs a whopping 1.15 million and has a lot to show for its costs. With almost 1,000 square meters of looping circuits, the pump track is massive. The tar surface is as smooth as any, and a huge amount of...
Rockdale Skatepark
The New Rockdale Skatepark is one of Sydney's best mellow street parks. The skatepark is part of a 20 million dollar to upgrade the park from what once was previously a bowling club. The skatepark features a mellow street plaza style set up with a mellow open bowl...