The New Leumeah Pump Track cost $490,000 to design and construct. The pump track was opened in early 2021 and has been a popular facility for skaters, scooters and, more often, bikes.
The pump track is made out of tar and is very smooth. The layout of the track offers a number of different lines with humps and bumps that offer more speed than you need.
The landscaping of the park is some of the best we have seen at a pump track. Someone must be listing to the skaters crying out and pleading for the landscaping not to include tanbark. The green grass is a blessing and something we see more of at other pump tracks and skateparks.
The pump track is under lights, so you can cruise at night. A super fun pump track and a great addition to Leumeah Skatepark.
Jerry Bailey Oval Skate Park
Located in Shoalhaven Head Lion Park lies Jerry Bailey Oval Skate Park. The skatepark features a large bowl and a fun little street section. The bowl has several different sections with roll-in, extension, hips and a deep end. The street section of the park has the...
Culburra Beach Skate Park
Built by United Skate Parks, the Culburra Beach Skate Park can be found on Curly Bay foreshore in the centre of town. The concrete skatepark has a bunch of mellow street features with an open-flow configuration. There are rails, banks, ledges, humps, manny pads,...
Nowra Skate Park
Designed by Convic Skate Parks, the relatively new Nowra Skatepark is a great addition to the New South Wales skatepark infrastructure. The concrete skatepark can be found at the end of McGrath Ave, Nowra, NSW. The skatepark has a whopping four mini ramps and a...