Another average pre-fab skatepark in Newcastle, NSW. The small concrete surface is rough, we are sure it had seen better days.
There are several Pre-fab features that rest on top of the concrete base. Features include quarters, banks, euro, spine and rail.
Plenty of parking, a lovely oval, park bench and bins. The council benefits that we appreciate, although New Lambton, up your game and build a better skatepark.
Leumeah Pump Track
The New Leumeah Pump Track cost $490,000 to design and construct. The pump track was opened in early 2021 and has been a popular facility for skaters, scooters and, more often, bikes. The pump track is made out of tar and is very smooth. The layout of the track offers...
Batemans Bay Skatepark
Batemans Bay Skatepark has been upgraded over the years to its current glory. The skatepark extension was designed and constructed by Oasis Skateparks and includes the bowl. Batemans Bay Skatepark features a large open bowl with smooth concrete and steel coping. The...
Appin Skatepark
The new Appin Skatepark can be found in Appen Park. The freshly laid concrete has an enclosed bowl and a large street-style plaza. The bowl has two circular sections that all interconnect with a rectangle. There is a drain that makes for a reasonable gap to clear in...