The new $200,000 skatepark upgrades at Darlington Point Skate Park opened to the public to skate in early 2022. The original concrete park remains practically untouched, whilst a newly upgraded park was constructed and added to the total surface area of the skatepark.

The new section of the skatepark consists of a super mellow open bowl and a mini ramp. The original skatepark left untouched contains several transitions, a spine, a mini ramp and a few street features.

A well-constructed and designed skatepark with a seamless flow between the new and the old sections.

Skater Maps Three Star Skatepark Rating
DARLINGTON POINT SKATEPARK WEATHER
Skatepark Upgrades
The Ridge Pump Track

The Ridge Pump Track

There is a new pump track in Barden Ridge. The Ridge Pump Track costs a whopping 1.15 million and has a lot to show for its costs. With almost 1,000 square meters of looping circuits, the pump track is massive. The tar surface is as smooth as any, and a huge amount of...

Rockdale Skatepark

Rockdale Skatepark

The New Rockdale Skatepark is one of Sydney's best mellow street parks. The skatepark is part of a 20 million dollar to upgrade the park from what once was previously a bowling club. The skatepark features a mellow street plaza style set up with a mellow open bowl...

Leumeah Skatepark

Leumeah Skatepark

There is a super mellow mini ramp and some small street features, along with a bunch of larger half pipes, banks and featured obstacles. We didn't get to skate at Leumeah Skatepark as it had been raining, but it looked like a lot of fun could be had. The sloping...

Search Marketing