The new $200,000 skatepark upgrades at Darlington Point Skate Park opened to the public to skate in early 2022. The original concrete park remains practically untouched, whilst a newly upgraded park was constructed and added to the total surface area of the skatepark.
The new section of the skatepark consists of a super mellow open bowl and a mini ramp. The original skatepark left untouched contains several transitions, a spine, a mini ramp and a few street features.
A well-constructed and designed skatepark with a seamless flow between the new and the old sections.



















Curran’s Hill Skatepark
A small skatepark with transitions and a ledge. The park has some modern humps in the middle to help us pump from end to end. There are quarters at each end, one of which is curved. There is a cool banking quarter in the middle and a ledge on the other side. They have...
The Ridge Pump Track
There is a new pump track in Barden Ridge. The Ridge Pump Track costs a whopping 1.15 million and has a lot to show for its costs. With almost 1,000 square meters of looping circuits, the pump track is massive. The tar surface is as smooth as any, and a huge amount of...
Rockdale Skatepark
The New Rockdale Skatepark is one of Sydney's best mellow street parks. The skatepark is part of a 20 million dollar to upgrade the park from what once was previously a bowling club. The skatepark features a mellow street plaza style set up with a mellow open bowl...




