The original Junee Skatepark was opened in February 2002 and has since been updated with a cool street section.
The OG skatepark has a couple of large 3/4 bowls with a 6 ft spine connecting the two. There are a number of different sized transitions and a euro gap off to the side between the banks.
The new street section is fresh with mellow mini ramps, quarters, volcano, jump and some ledges. The new section connects smoothly with the OG bowls and creates for a large concrete surface.
The skatepark is under lights















New Lambton Skate Park
Another average pre-fab skatepark in Newcastle, NSW. The small concrete surface is rough, we are sure it had seen better days. There are several Pre-fab features that rest on top of the concrete base. Features include quarters, banks, euro, spine and rail. Plenty of...
Crescent Head Skatepark
The beautiful coastal town of Crescent Head on the Macleay Valley Coast in NSW is due for a new skatepark. The town is known as a holiday hot spot with gorgeous beaches and great surf. Unfortunately, the skatepark is letting the town down with only three pre-fab...
Byron Bay Skatepark
The new 2.6 million dollar skate facility in Byron Bay has officially opened to skate. The skatepark features two rad bowls, mini ramps with a spine and a comprehensive open-flow street section. The concrete is super smooth, the design is fantastic and the park is...




