The Murray Shire Council are stoked to show off their $440,000 Moama Echuca Community Skate Park. The Skatepark was constructed in 2011 and connects to the previous skatepark. The contrast between the new and the old skatepark is hard to miss and serves as a great example of how we can add to existing parks instead of building over the previously existing skatepark. The old skatepark makes for a rad street section with heaps of rails, an awesome concrete double quarter with spine, several ledges and a few steel ramps. The new section of Moama Skatepark is something to be admired by everyone and shredded by those lucky enough to ride it.
⊕ 2 Blair St, Moama NSW 2731
Curran’s Hill Skatepark
A small skatepark with transitions and a ledge. The park has some modern humps in the middle to help us pump from end to end. There are quarters at each end, one of which is curved. There is a cool banking quarter in the middle and a ledge on the other side. They have...
The Ridge Pump Track
There is a new pump track in Barden Ridge. The Ridge Pump Track costs a whopping 1.15 million and has a lot to show for its costs. With almost 1,000 square meters of looping circuits, the pump track is massive. The tar surface is as smooth as any, and a huge amount of...
Rockdale Skatepark
The New Rockdale Skatepark is one of Sydney's best mellow street parks. The skatepark is part of a 20 million dollar to upgrade the park from what once was previously a bowling club. The skatepark features a mellow street plaza style set up with a mellow open bowl...

[insta-gallery id="34"]


