The new $200,000 skatepark upgrades at Darlington Point Skate Park opened to the public to skate in early 2022. The original concrete park remains practically untouched, whilst a newly upgraded park was constructed and added to the total surface area of the skatepark.
The new section of the skatepark consists of a super mellow open bowl and a mini ramp. The original skatepark left untouched contains several transitions, a spine, a mini ramp and a few street features.
A well-constructed and designed skatepark with a seamless flow between the new and the old sections.
Moorebank Skatepark
Moorebank Skatepark would have been an epic skatepark when it was originally created in the millennial. The skatepark is still a lot of fun, but the design is starting to date, and the concrete surface has seen better days. The concrete skatepark features a skate bowl...
Currarong Skatepark
Also commonly referred to as Currarong Skate Ramp, The Currarong Skatepark has seen better days and was submerged with water from recent flooding. The skatepark features a sweet mini ramp with a hip and banks. There is also a single flat rail for the street skaters....
Holborn Park Skate Plaza
Designed and Constructed by our friends at Convic Skateparks, the Holborn Park Skate Plaza is some of the freshest concrete in Woollongong. Located in Holborn Park on the banks of Lake Illawarra in the urban sprawl of Woollongong. The park has an open flow layout with...