The New Griffith Pump Track was opened in 2022. The tar pump track was designed and built by dedicated and hard-working contractors at World Trial Pty Ltd.
The Stronger Countries Community Fund financed the pump track with a $440,000 budget.
The pump track is fun to pump around and navigate your way around. Several different loops, courses and lines can be found—a great workout to pump around on a skateboard, super popular with scooters and bike riders.












New Lambton Skate Park
Another average pre-fab skatepark in Newcastle, NSW. The small concrete surface is rough, we are sure it had seen better days. There are several Pre-fab features that rest on top of the concrete base. Features include quarters, banks, euro, spine and rail. Plenty of...
Crescent Head Skatepark
The beautiful coastal town of Crescent Head on the Macleay Valley Coast in NSW is due for a new skatepark. The town is known as a holiday hot spot with gorgeous beaches and great surf. Unfortunately, the skatepark is letting the town down with only three pre-fab...
Byron Bay Skatepark
The new 2.6 million dollar skate facility in Byron Bay has officially opened to skate. The skatepark features two rad bowls, mini ramps with a spine and a comprehensive open-flow street section. The concrete is super smooth, the design is fantastic and the park is...




