The Murray Shire Council are stoked to show off their $440,000 Moama Echuca Community Skate Park. The Skatepark was constructed in 2011 and connects to the previous skatepark. The contrast between the new and the old skatepark is hard to miss and serves as a great example of how we can add to existing parks instead of building over the previously existing skatepark. The old skatepark makes for a rad street section with heaps of rails, an awesome concrete double quarter with spine, several ledges and a few steel ramps. The new section of Moama Skatepark is something to be admired by everyone and shredded by those lucky enough to ride it.
⊕ 2 Blair St, Moama NSW 2731
Finley Skatepark
Finley has been blessed with a new skatepark in the exact location of the previous park. Everything from the previous skatepark has been demolished and built again from the ground up. The New Finley Skatepark has a smooth concrete base with quarters at each end and...
Tolland Pump Track
Tolland Pump Track can be found on Bruce St in Tolland, Wagga Wagga. The pump track is better suited for bikes and scooters and a great beginner track to get rolling. The humps and bumps at Tolland Pump Track are too small and insignificant to keep your speed and pump...
Griffith Pump Track
The New Griffith Pump Track was opened in 2022. The tar pump track was designed and built by dedicated and hard-working contractors at World Trial Pty Ltd. The Stronger Countries Community Fund financed the pump track with a $440,000 budget. The pump track is fun to...

[insta-gallery id="34"]


